Lab EquipmentBioCryst Pharmaceutical - Birmingham, Ala
Plumbing and HVAC for new research labs and offices and expansion of existing facilities.

Mrs. Stratton's Salads - Birmingham, Ala.
Project consisted of installing refrigeration for food preparation areas and medium-temperature cooling systems. Hardy also installed HVAC systems and plumbing for Phase II building expansions.


Car Hoods

Honda America Motor Company - Lincoln, Ala.
Hardy installed HVAC systems for the Honda Training Facility, process piping for Paint Shop and equipment connections for the Body Paint Line and Bumper Line.


Piggly Wiggly Piggly Wiggly Food Storage Warehouse - Bessemer, Ala.
Hardy's relationship with the "Pig" began over 30 years ago with the servicing of their main food storage facility in Ensley, Ala. When they built their current 60,000 S. F. cold storage warehouse facility in Bessemer, Hardy installed the refrigeration and freezer systems including six (6) high and low pressure compressors with approximately 20,000 lbs. of ammonia refrigerant. Hardy personnel continue to provide full-time on-site operation and maintenance of the system.


Birmingham Budweiser Distributing Co. - Birmingham, Ala.

Hardy Corporation installed the original 100-HP split system R-22 systems for refrigerating the controlled environmental Budweiserwarehouse (CEW) areas for this beverage company. Birmingham Bud has twice added CEW space and chose Hardy to install and maintain the refrigeration systems for both additions.

SMI Steel Co. (Division of Trinity Industries) Birmingham, Ala
Process piping for Continuous Caster Line, new Electric Arc Furnaces, and Ladle Melting Station. Various HVAC and plumbing installations for control rooms and offices.

Ogihara America Corporation - Birmingham, Ala.Ogihara America Corporation
Ogihara manufactures body panels for the Mercedes-Benz automotive assembly plant in  nearby Tuscaloosa. Hardy's work included 728 tons of cooling, process piping, and sanitary plumbing. We have also completed the mechanical work in Ogihara's plant expansion.

MichelinMichelin Tire Co. of North America - Tuscaloosa, Ala
Hardy installed two (2) chillers totaling 2,400-tons, steam and hot water boilers for building heat and manufacturing process. Phase II: Hardy installed compressed air system, high and low pressure steam and additional chilled water piping.