BioCryst
Pharmaceutical - Birmingham, Ala
Plumbing and HVAC for new research labs and offices and expansion of existing
facilities.
Mrs.
Stratton's Salads - Birmingham, Ala.
Project
consisted of installing refrigeration for food preparation areas and medium-temperature
cooling systems. Hardy also installed HVAC systems and plumbing for Phase
II building expansions.

Honda
America Motor Company - Lincoln, Ala.
Hardy installed HVAC systems for the Honda Training Facility,
process piping for Paint Shop and equipment connections for the Body Paint
Line and Bumper Line.
Piggly Wiggly Food Storage Warehouse - Bessemer, Ala.
Hardy's relationship with the "Pig" began over 30 years ago with the servicing
of their main food storage facility in Ensley, Ala. When they built their
current 60,000 S. F. cold storage warehouse facility in Bessemer, Hardy
installed the refrigeration and freezer systems including six (6) high
and low pressure compressors with approximately 20,000 lbs. of ammonia
refrigerant. Hardy personnel continue to provide full-time on-site operation
and maintenance of the system.
Birmingham Budweiser Distributing Co. - Birmingham,
Ala.
Hardy Corporation installed the original 100-HP split system R-22 systems
for refrigerating the controlled environmental warehouse
(CEW) areas for this beverage company. Birmingham Bud has twice added
CEW space and chose Hardy to install and maintain the refrigeration systems
for both additions.
SMI
Steel Co. (Division of Trinity Industries) Birmingham, Ala
Process piping for Continuous Caster Line, new Electric Arc Furnaces,
and Ladle Melting Station. Various HVAC and plumbing installations for
control rooms and offices.
Ogihara America Corporation - Birmingham, Ala.
Ogihara manufactures body panels for the Mercedes-Benz automotive
assembly plant in nearby Tuscaloosa. Hardy's work included
728 tons of cooling, process piping, and sanitary plumbing. We have also
completed the mechanical work in Ogihara's plant expansion.
Michelin
Tire Co. of North America - Tuscaloosa, Ala
Hardy installed two (2) chillers totaling 2,400-tons, steam and hot water
boilers for building heat and manufacturing process. Phase II: Hardy installed
compressed air system, high and low pressure steam and additional chilled
water piping.
|