Hardy Corporation
About Us
HVAC
Plumbing
Industrial
Energy Savings
Maintenance
Projects
Email Us

Phone 205.252.7191
Fax 205.326.6268
430 12th Street South
Birmingham, AL 35233
Central plant at State Farm
Central plant at State Farm regional headquarters provides 1,665 tons of cooling capacity

To maintain the high quality and reduce labor costs, Hardy prefabricates duct and piping assemblies at its plant in Birmingham. Typical Hardy projects range from installing a single package unit for a tenant space build-out, to a turn-key mall or high-rise office tower. With our 20,000 sq. ft. automated fabrication facility in Birmingham, we can meet or exceed fast-track construction schedules. The most popular feature, however, is our ability to eliminate unnecessary cost and reduce the contract price.

Air-lifting roof top units on a corporate office project
Air-lifting roof top units on a corporate
office project
Exposed spiral duct at Organixed Living retail store
Exposed spiral duct at Organized Living retail store meets architect's requirements

 

A particular specialty of Hardy is mechanical renovation in occupied facilities. Whether the job is replacing chillers, or air handling units in an occupied office building, or installing new duct systems in a department store, Hardy schedules and plans the work to fit the owner's requirements. Working midnight to 8:00 a.m. is never a problem.

Specific HVAC Capabilities:                  

      Duct       Piping
     • Galvanized
     • Spiral
     • Welded
     • Fiberglass
     • Paint Grip
     • Stainless
     • Aluminum
     • Copper
     • Steel
     • Copper
     • Stainless
     • Galvanized
     • Fiberglass
     • Certified
       Welding

 

 

 

 

Hardy's precise duct cutting and fabrication equipment insures an exact fit.
Hardy's precise duct cutting and fabrication equipment insures an exact fit