Honda
America Motor Company - Lincoln, Ala.
Hardy installed HVAC systems for the Honda Training Facility, process
piping for Paint Shop and equipment connections for the Body Paint Line
and Bumper Line.
Mercedes-Benz Training and
Customer Service Center - Tuscaloosa,
Ala.
This 150,000 S.F. corporate facility built in 1996 included 540-tons of
cooling, two (2) hot water boilers, 16 air handling units, 80 variable
air volume (VAV) zones, direct digital controls, and a unique air duct
system that followed the undulating shape of the roof.
Ogihara America Corporation - Birmingham, Ala.
Ogihara manufactures body panels for the Mercedes-Benz automotive assembly
plant in nearby Tuscaloosa. Hardy's work included 728 tons of cooling,
process piping, and sanitary plumbing. We have also completed the mechanical
work in Ogihara's plant expansion.

Freightliner Liberty Trucks - Birmingham, Ala.
Hardy installed water and sewer plumbing and compressed air
piping systems for this heavy truck sales and service company near Birmingham.

GMC/Volvo Trucks - Fultondale, Ala.
Hardy installed
the HVAC systems for this 43,000 S.F. truck sales and service facility.
Boyd Brothers Transportation - Birmingham, Ala.
Plumbing
and HVAC systems were installed by Hardy for this 51,000 S.F. trucking
company headquarters
building. Plumbing included water and sewer systems, compressed air, and
gas piping. HVAC system included packaged units, variable volume and temperature
(VVT) controls, truck exhaust outlets, and gas unit heaters.
|
 |